We pride ourselves in being able to offer the full range of planning services, with a professional, courteous and friendly approach that has clients coming back again & again.
prop-development
A particularly successful area of our business that we're very proud of. We cover the whole range of the appeals process and represent clients throughout.
prop-development
With access to a range of complimentary expertise we can provide a full property development service, from site searches, development briefs and acquisitions.
prop-development
The ever more complex nature of planning applications means that our services in this field of Town Planning are increasingly in demand.
READ MORE READ MORE READ MORE READ MORE
Case Studies
Industrial Premises, St. Asaph

We were engaged to assist our clients in addressing their concerns over the construction of an electricity cable and substation to serve a new off-shore wind farm which would site the proposed substation in close proximity to their industrial premises. Our clients business involved the manufacture of high tech optics in a process which was extremely sensitive to disturbance of any kind.

In depth discussions were held between the Planning Department, the agents of the wind farm developer and ourselves, and as a result of these discussions and representations made to the planning committee all of our clients concerns were addressed, with a comprehensive monitoring scheme put in place to ensure that any potential disturbance to their business was addressed.

 
Guest House, Llandudno

North Wales Housing Association had purchased a guest house in Llandudno with the intention of providing a facility to allow vulnerable adults to holiday in the area, thus giving them a break from their carers. However restrictions on the use of the building prevented it from being used for any other purpose than a guesthouse. We prepared a detailed case which demonstrated that the proposed use of the building to provide ‘breaks’ for vulnerable adults, with some supervisions by staff, did not constitute a change from the existing use of the building as a guesthouse. Following lengthy discussions with the Council a Certificate of Lawful use was granted confirming this and the Housing Association was able to develop this vital facility.

 
Gas Distribution Centre, Gaerwen

Our clients wished to replace their existing gas storage tanks with a larger unit to allow them to rationalise their existing storage needs, and also to increase the volume that could be stored on site. Having examined the site and local policies we prepared a planning application and Hazardous Substances Consent Application, which detailed the economic rationale for the proposal. Following detailed consideration of the proposal permission was granted by the Council and Health and Safety Executive for the development.

Gas-Distribution

 
Sites at Glyn Garth, Anglesey

We were instructed to by our client to prepare objections to proposals for new dwellings close to the village of Glyn Garth on Anglesey. Both sites had support from the Councils Planning Policy section, however upon closer examination it was clear that these sites were not suitable for development.

Following the submission of soundly based planning objections to the Council on our clients behalf both applications were refused.

 
Pen Barras Lodge, Llanferres

We were asked to advise our clients on the possibility of replacing a static caravan on their land, which benefited from a lawful use certificate for holiday purposes. However the original lawful use decision described the caravan as being a touring caravan, rather than a static unit. On the basis of this description the Council were unwilling to allow a replacement static caravan to be installed.

Having investigated the History of the site it became clear that a static caravan had occupied the site for a considerable number of years, and as such the existing caravan was entirely lawful and its replacement with another unit would be entirely appropriate. An application was submitted to the Council providing detailed evidence to substantiate this claim. However the Council refused the application, requiring that an appeal be submitted to challenge this refusal.

Following submission of the appeal we were approached by the Council with an offer to negotiate for a replacement unit, demonstrating that perhaps their original decision was incorrect. Following negotiations with the Council the client was granted permission for a replacement chalet, a substantial improvement from the existing unit on site.

 